Our Projects

Site Rehabilitation & Readiness Upgrade – Mandi Bahauddin (IP EDGE I)

Affinity Associates successfully carried out comprehensive rehabilitation and upgrades at the Mandi Bahauddin site, ensuring it met operational standards. The work included structural improvements, electrical system enhancements, and equipment installations to support IP EDGE operations.

Infrastructure Revamp for Operational Readiness – Phalia (IP EDGE II)

This project focused on bringing the Phalia site up to operational standards under IP EDGE II. Our team executed full-scale renovations including civil works, electrical installations, and technical upgrades to meet all safety and performance criteria.

Dual-Site Modernization Project – Lohianwala & Peoples Colony (IP EDGE III)

Covering both Lohianwala and Peoples Colony, this project involved extensive rehabilitation, structural reinforcement, and deployment of advanced telecom equipment. Affinity Associates ensured both locations achieved full operational capability in line with industry benchmarks.

Comprehensive Civil & Electrical Site Revamp

Affinity Associates revamped multiple sites, addressing both civil and electrical infrastructure to boost efficiency and performance. Upgrades included infrastructure improvements, electrical system enhancements, and the latest technology integration.

Grounding Solutions for MSAGs Stability & Protection

This project enhanced the stability of Multi-Service Access Gateways (MSAGs) through advanced grounding systems. These measures safeguarded the equipment against electrical surges, ensuring secure and reliable network performance.

Power Systems Technical Review & Enhancement (PES GTR)

Our team conducted a detailed technical review of power systems under the PES GTR initiative, identifying key areas for improvement and implementing targeted upgrades to optimize performance and enhance system reliability.

Regional Connectivity Pilot Project – NE & NTDC Collaboration

In partnership with NE (North East) and NTDC, Affinity Associates led this pilot project to test and implement next-generation communication technologies, improving regional connectivity and operational efficiency.

OLT Infrastructure Readiness – Phase I

Affinity Associates prepared Optical Line Terminal (OLT) sites for operational deployment through thorough assessments, equipment installations, and adherence to strict operational standards to ensure seamless performance.

Three-Year IT Systems Maintenance Program – GEPCO 2024

This long-term project supported GEPCO’s IT infrastructure with regular maintenance, repairs, and system optimizations over a three-year period. Our proactive support ensured uninterrupted performance and minimized downtime.

Diesel Generator Systems Maintenance Program – GTR 2021–22

Affinity Associates managed the maintenance and repair of Diesel Generator systems under the 2021–22 General Technical Review, delivering essential repairs, routine checks, and performance optimizations to ensure operational reliability.